We know engineering

To know us is enough for you
HomeAbout usПлощадкиServicesProjectsCareerContacts
Design and manufacture of advanced service solutions for the oil and gas industry
Book a consultation
projects

Deployment of a non-cemented liner with ball-actuated multistage fracturing system

More projects

Deployment of a Non-Cemented Liner in a High-Temperature Geothermal Wel

More projects

Deployment of a Cemented liner in a production well

More projects

Wellhead replacement using RIBP retrievable inflatable bridge plug in Urengoi oilfield

More projects

products

90+ items
Completion

Комплекс технических устройств, включающий подвески хвостовиков, муфты ГРП, элементы верхнего заканчивания и колонную оснастку и другое оборудование

Plugs

Скважинные устройства, предназначенные для герметичного перекрытия ствола скважины, изоляции пластов, удержания давления или создания опоры

Packers

Герметизирующие скважинные устройства, устанавливаемые в обсадной колонне, колонне насосно-компрессорных труб или открытом стволе скважины

Thru tubing

Компактные инструменты и устройства для проведения ремонтно-изоляционных, диагностических, перфорационных, промывочных, ловильных и прочих операций.

Patches

Внутрискваженные ремонтные устройства, которые после спуска в скважину механически или гидравлически расширяется до плотного прилегания к внутренней поверхности обсадной колонны.

Completion

Comprehensive set of downhole tools and associated accessories installed in the wellbore to provide structural integrity, zonal isolation, pressure containment, flow control, and stimulation capability, enabling safe and efficient transition from drilling to production or injection operations.

Plugs

Temporary or permanent downhole device designed to provide pressure-tight wellbore isolation by sealing the internal bore or annular space, enabling formation isolation, pressure containment, and serving as a bridge plug during well intervention, cementing, stimulation, and other downhole operations.

Packers

Downhole sealing device installed in casing, tubing, or open hole to provide zonal isolation by sealing the annular space, enabling separation of formations, pressure containment, and controlled fluid flow during drilling, completion, production, injection, or workover operations.

Thru tubing

Compact downhole tools and devices that are run and retrieved through the installed production tubing without its removal, enabling remedial isolation, diagnostics, perforating, washing, fishing, and other well intervention operations with minimal rig time, cost, and operational disruption.

Patches

In-well repair device made of a special ductile material that, after being run into the well, is expanded to tightly conform to the inner wall of the casing, providing sealing of damaged sections, restoring structural integrity, and ensuring zonal isolation without significant reduction of the internal diameter.

Catalog of all products

Look at the our full product catalog and find what's right for you.

— developer

& manufacturer of advanced oil and gas products

We specialize in well completion solutions and downhole operations

projects

See all projects
Liner Hanger
Deployment of a Cemented Liner in a Production Well
OSPREY

Required the deployment, installation, and cementing of a liner in a deviated production well in the Chepakovskoe field, with a formation temperature of 146°C

Liner Hanger
Deployment of a Non-Cemented Liner with Ball-Actuated Multi stage Fracturing System
SAPSAN

Required the installation of a liner in a pilot geothermal well at the Podravska Slatina field, where the reservoir temperature reaches 300°C

See all projects
They trust us

clients and partners

01

LLC LUKOIL- Nizhnevolzhskneft

02

Arcticgas JSC

03

AO Achimgaz

04

Gazpromneft-Zapolyarye LLC

05

SLB (Schlumberger)

06

Slavneft-Megionneftegaz PJSC

07

Salym Petroleum Development N.V.

08

JSC "Ermakovskoye Well Repair Enterprise

09

JSC "BashVzryvTechnologii"

10

Engs OOO

11

ТОО «Caspian Integrated»

12

CJSC SP Mekamineft

13

Nyutekh Vell Service LLC

14

Belorusneft

15

LLC "Production and Commercial Firm "GisNefteService"

16

ZERS Scientific and Technical Center
facilities

We control the process from start to finish

Подробнее
1
Engineering center

Our team of engineers uses advanced materials science, finite element analysis, and hydraulic modeling to develop tools that withstand high pressure and high temperature (HPHT) conditions. This ensures structural integrity and operational reliability.

2
R&D - Testing facility

We use a dedicated circulation system that simulates horizontal casing conditions for realistic dart wear testing and high-performance flow testing. Our HPHT test facility includes axial force capability for pushing and pulling within the required tensile strength under controlled pressure and temperature.

3
Laboratory

Through interactive prototyping and laboratory simulations, we integrate field test data to address challenges:

- Zonal isolation
- Flow control
- Tool deployment efficiency
- Support for precise well interventions

Подробнее

we work all over the country

Сentral office
Moscow, Volokolamskoe highway, 89, office 407
Surgut Base
Surgut, Industrialnaya St., Building 1, Bldg. 4
Kobyakovo base
Moscow region, Odintsovsky district, village Kobyakovo (urban settlement Golitsyno), Centralnaya street, 27A
1
Сentral office
Moscow, Volokolamskoe highway, 89, office 407
2
Surgut Base
Surgut, Industrialnaya St., Building 1, Bldg. 4
3
Kobyakovo base
Moscow region, Odintsovsky district, village Kobyakovo (urban settlement Golitsyno), Centralnaya street, 27A
gallery

symoil day to day

Конструкция подвески обеспечивает полный контакт со стенкой обсадной колонны, надежное якорение и повышенную износостойкость.

Still have questions? Ask us.

Your application has been accepted! We'll get back to you as soon as possible.
Oops! Something seems to have gone wrong, please try again.
Сentral office
Moscow, Volokolamskoe highway, 89, office 407
Surgut Base
Surgut, Industrialnaya St., Building 1, Bldg. 4
Kobyakovo base
Moscow region, Odintsovsky district, village Kobyakovo (urban settlement Golitsyno), Centralnaya street, 27A
© SYMOIL - All rights reserved

Design and manufacture of advanced service solutions for the oil and gas industry

Our website uses cookies and Yandex Metrica web analytics tools to measure traffic and analyze user behavior.
Ok