HomeAbout usПлощадкиServicesProjectsCareerContacts
Non Cemented Liner Hanger

Non-cemented hydraulic liner hanger designed for reliability and performance in demanding downhole environments

Description:

Features:

Bi-directional slip design for secure hanging and pressure containment
Anti-preset mechanism for enhanced operational safety
High-pressure rated for challenging well conditions
No internal setting chamber, increasing burst and collapse strength
Customizable PBR lengths from 1.5 ft to 20 ft

Specifications:

usage example

Deployment of a Non-Cemented Liner with Ball-Actuated Multistage Fracturing System

location
Zapadnaya Prorva Field, Kazakhstan
problem

Required a solution for deploying and installing a liner in a horizontal well at the Zapadnaya Prorva field, as part of a project aimed at increasing production through the implementation of a multistage hydraulic fracturing (MSHF) system

solution

Our company supplied the Sapsan non-cemented liner hanger system, engineered for high-pressure applications up to 69 MPa

work process

The Sapsan liner hanger was deployed on drill pipe and set inside the 178 mm production casing

The hanger was hydraulically set using surface equipment, creating a secure pressure barrier rated to 69 MPa and 149 °C

A polished landing funnel on the upper end of the Sapsan hanger, combined with a sealing stinger, provided a secure tieback between the fracturing string and the 114 mm liner

Subsequent multistage fracturing operations were executed as planned

This product is usually taken with:

Liner Hanger
Osprey Cemented Liner Hanger

OSPREY is a hydraulic-set, hydraulic-release rotational liner hanger designed to suspend liners securely within intermediate or production casing strings

Liner Hanger
Repair packer

The Repair Packer is designed for remedial operations where leakage or a loss of integrity has occurred at the liner-top packer of systems such as SAPSAN or OSPREY

Still have questions? Ask us.

Your application has been accepted! We'll get back to you as soon as possible.
Oops! Something seems to have gone wrong, please try again.
Сentral office
Moscow, Volokolamskoe highway, 89, office 407
Surgut Base
Surgut, Industrialnaya St., Building 1, Bldg. 4
Kobyakovo base
Moscow region, Odintsovsky district, village Kobyakovo (urban settlement Golitsyno), Centralnaya street, 27A
© SYMOIL - All rights reserved

Design and manufacture of advanced service solutions for the oil and gas industry